Scrapping components
During manufacture, components Raw materials used to manufacture finished goods. or raw materials The base materials from which sub-assemblies, components and finished goods are made. may become spoilt or damaged and need to be scrapped. You can scrap The loss of a completed part. materials after issue.
The stock levels are automatically adjusted in the Stock Control module.
If components are traceable and part of a completed item on the works order, they cannot be scrapped. However, you can substitute traceable components to scrap. You may need to do this if you need to replace an item that has failed quality control processes.
To scrap components
Open: Works Orders > Processing > Scrap > Scrap Components.
- Select the works order from the drop-down list.
- If you are scrapping components for a one-off works order, select the required stage.
-
Select the required component and enter the amount of the components to scrap in the Scrap Now box.
More about the scrap now valueThis must not exceed the quantity that has already been issued. It must be a valid stock unit quantity. If it is not valid, the quantity is automatically adjusted to the nearest appropriate value.
If the component is traceable, a list of issued traceable items is displayed when you move from the Scrapped box. Select from the list of traceable item numbers those which are to be scrapped to the value of the quantity in the Scrapped box.
If you select a traceable component that has been incorporated in a finished item (a completed works order) then you cannot scrap the item. However, you can substitute the item in the finished item and then scrap the component.
- Select the Scrap Code relating to the reason behind the scrapping.
- Enter any additional text required in the Scrap Text box.
- Repeat the above steps for each component.
- To proceed, click OK.
-
Confirm that you want to save the changes when prompted.
If the component is traceable, the record is retained showing that the items were issued to the works order but the record is marked as scrapped.
A scrap transaction is created and linked to the works order. This shows the date, time, operator, quantity and reason code together with the works order and product.
All components Raw materials used to manufacture finished goods. issued against this works order are listed. You can view the amount required and the number of components that have been scrapped already.