Project allocation

Use this option to allocate stock items to a specific project.

To allocate stock to a project

Open: Stock Control > Allocations > Project Allocation.

  1. Select the stock item from the Code list.
  2. Enter the details on the following tabs:

  3. Record batch/serial numbered items.

    This is only applicable if your system is set to allocate batch/serial numbers prior to despatch.